MRP Project Scheduler

Location: 

Paris, FR

Employment type:  Employee
Place of work:  Hybrid
Offshore/Onshore:  Onshore

TechnipFMC is committed to driving real change in the energy industry. Our ambition is to build a sustainable future through relentless innovation and global collaboration – and we want you to be part of it. You’ll be joining a culture that values curiosity, expertise, and ideas as well as diversity, inclusion, and authenticity. Bring your unique energy to our team of more than 20,000 people worldwide, and discover a rewarding, fulfilling, and varied career that you can take in anywhere you want to go.  

Job Purpose

Performs detailed inventory analyses and address issues in an effort to keep system data accuracy high, excess inventory minimized, and manufacturing/fabrication plans on schedule. Plan, schedule, execute and control key support functions, manufacturing sources and suppliers to meet scheduled shipments in a quality and cost-effective manner.Monitor and schedule the flow of materials, components, assemblies, and inventory. This position reports directly to the SAP MRP Planning Manager, in the Paris/Africa Subsea Projects Organizational Unit in Paris, France.

Job Description

  • Determine the sources of the components (to make or to buy) per current TechnipFMC operation sourcing strategy and enters into the system to notify manufacturing and supply chain of project demands. Initiates Project sales orders for entry into the ERP system. 
  • Update the manufacturing/fabrication execution plan for assigned projects to ensure that parts are produced or purchased as needed and in the proper sequence.   
  • Assist with the project team effort to synchronize project priorities and Engineering design release dates to ensure acceptable procurement and manufacturing schedules. 
  • Monitor the flow of inventory through assigned projects. 
  • Avoid creation of excess inventory and makes recommendations for substitutions & alternates, where possible, to use and to reduce existing inventory. 
  • Maintain and updates the manufacturing execution plan for assigned projects to ensure that parts are produced or purchased as needed and in the proper sequence. 
  • Interface with Engineering to define the manufacturing bill of material and to establish release schedules.
  • Assist manufacturing and fabrication areas in prioritization efforts.
  • Analyze supply and demand of inventory and long-lead parts and takes corrective actions as needed to alleviate schedule impacts or excess inventory.
  • Analyze inventory for supply/demand mismatches, takes appropriate action to correct.
  • Analyze and corrects excess supply orders in the ERP system.
  • Review Excess Inventory of Project and Non-Project parts, recommends actions to be taken.

You are meant for this job if:

  • You hold a Bachelor's in related field, or equivalent years of experience.
  • SAP system experience and understanding in manufacturing and procurement.
  • Minimum 4+ years of experience performing material planning, inventory analysis, supply/demand analysis and reconciliation, and/or manufacturing scheduling in materials planning, scheduling, production control or procurement with working knowledge of ERP (Enterprise Resource Planning) or MRP (Material Resource Planning) systems.
  • Procurement knowledge, inventory and manufacturing processes, as well as a good understanding of typical ERP system capabilities, inputs, and outputs. 
  • Understanding of machining, fabrication, and manufacturing processes.
  • Ability to read and understand manufacturing routings and identify when changes need to be made. 
  • Understands system shortage reports and accurately ascertains critical path issues preventing on time delivery to Project requirement dates.
  • Oil&Gas background

 

Being a global leader in the energy industry requires an inclusive and diverse environment. TechnipFMC promotes diversity, equity, and inclusion by ensuring equal opportunities to all ages, races, ethnicities, religions, sexual orientations, gender expressions, disabilities, or all other pluralities. We celebrate who you are and what you bring. Every voice matters and we encourage you to add to our culture.

TechnipFMC respects the rights and dignity of those it works with and promotes adherence to internationally recognized human rights principles for those in its value chain.

Learn more about TechnipFMC and find other open positions by visiting our Career Page.

Follow us on LinkedIn for company updates.

Date posted:  Jan 17, 2025
Requisition number:  10009